Mon 19 May 2014, 15:42 GMT

Electrical power and propulsion systems for offshore vessels


ABB system package is designed to provide reliable and fuel efficient propulsion.



ABB, the leading power and automation technology group, has won contracts worth in excess of $20 million to supply electrical power and propulsion systems for two next generation offshore vessels.

The first vessel, of Ulstein SX165 design, is being constructed at Ulstein Verft in Norway for Island Ventures 11, the joint venture set up in 2012 by the US and Norwegian owners Edison Chouest Offshore and Island Offshore, whose advanced subsea service vessels provide solutions to the offshore oil industry.

At 28 meters wide and 145.7 meters long, and with accommodation for 200 people, the SX165 will be the largest vessel constructed by Ulstein Verft and is due for delivery in the third quarter of 2015. It is equipped with two cranes that can lift 400 tonnes and 140 tonnes respectively, and has three separate engine rooms to provide extreme operational reliability.

ABB is to supply an advanced complete power and diesel electric system package comprising medium voltage generators, switchboards, transformers, frequency converters and motors to provide reliable and fuel efficient propulsion. Health, safety and the environment have been a key focus in the design of the vessel and ABB’s scope of supply reflects this through its advanced power system, which is capable of achieving the requirements needed to run the system in closed ring in DP3.

The second vessel, for Island Offshore, features the innovative Rolls-Royce UT 777 design for optimal subsea operations including top hole drilling, light well intervention, subsea construction and inspection, maintenance and repair work. ABB will supply an advanced complete power and diesel electric system package comprising medium voltage generators, switchboards including power management system, transformers, frequency converters and motors. ABB will also supply complete fire & gas monitoring and control systems for fire and gas detection.

In addition, both power distribution and propulsion systems will be monitored by ABB’s remote diagnostic system (RDS), which helps to reduce repair time of installations and improve operational safety when reducing the need for on-site visits by providing immediate 24/7 assistance from a global technical center.

The second vessel will be constructed at Kawasaki Heavy Industries in Japan and delivery is scheduled for 2017.

"ABB’s advanced power system and remote diagnostic system will maximize the operational flexibility and safety.” said Heikki Soljama, head of ABB’s Business Unit Marine and Cranes. "We look forward to cooperating in the projects and to delivering high quality services to these pioneering new ships."

Image: Ulstein SX165 design.

ABB  

Person signing a document. Venture Energy signs green methanol supply deal with Shenji Energy  

Hong Kong-based firm to purchase ISCC EU-certified biomass-derived methanol for shipping clients.

Steel cutting ceremony of vessel with builder's hull no. CHB2060. Changhong International begins construction on second 11,400-teu LNG dual-fuel container ship  

Chinese shipbuilder starts work on vessel CHB2060, second of 18-ship series for Oceanroutes.

Keel-laying ceremony of Celsius. Keel laid for LNG bunkering vessel Celsius  

Turkish shipbuilder begins construction of dual-fuel bunkering vessel for Sirius Shipping and Gasum.

Marine ISTA alongside MSC Apollo vessel. Vitol’s Marine ISTA completes record 4,900 mt bunkering operation at Karachi Port  

Operation marks largest fuel supply at Pakistani port, highlighting potential for regional bunkering hub development.

Aurora Botnia vessel. Gasum and Wasaline extend bio-LNG supply agreement to 2027  

Nordic energy company renews fuel supply contract with Finnish-Swedish ferry operator through 2027.

Luminara vessel truck-to-ship bunkering. MOL Techno-Trade completes Japan’s first truck-to-ship LNG bunkering for foreign cruise vessel  

Ritz-Carlton cruise ship Luminara refuelled at Nagasaki Port using truck-to-ship method on 3 April.

NKT Eleonora vessel cable-laying. Methanol-ready cable-laying vessel hull launched in Romania  

Shipbuilder floats hull of dual-fuel vessel designed for offshore renewable energy cable operations.

Dr Prapisala Thepsithar, GCMD. GCMD biofuels lead receives Singapore standardisation award  

Dr Prapisala Thepsithar recognised for contributions to marine biofuel specification development.

Marine Energy Wales (MEW) Conference 2026 graphic. Certas Energy to attend Marine Energy Wales conference in April  

Marine fuel supplier to discuss sector solutions at UK marine renewable energy conference.

Dinamo IV vessel. Sanmar completes sea trials for 14th all-electric tugboat  

Turkish shipyard marks half-century in business with latest battery-powered vessel from ElectRA series.