Tue 19 Jun 2012 15:11

Aegean's Nellos Filopoulos resigns


Senior Manager is set to leave Aegean Marine Petroleum after 16 years.



Nellos Filopoulos [pictured] has resigned from his position as Senior Manager, Marine Fuels at Aegean Marine Petroleum S.A, according to industry sources.

Filopoulos is a highly experienced member of the shipping and bunker industry and his career spans 27 years. He has been employed at Aegean Marine Petroleum for almost 16 years having joined the company in September 1996.

Prior to joining Aegean, Filopoulos worked as General Manager for Sheffield Maritime in London between August 1993 and August 1996.

He began his career in the marine fuels industry at BP Marine, Piraeus, in 1985, where he worked as Sales Manager from September 1985 to May 1992.

Details regarding the reason for his departure and his next appointment have not yet been revealed.


Lease agreement between Inter Terminals Sweden and the Port of Gothenburg, signed on July 1st. Pictured: Göran Eriksson, CEO of the Port of Gothenburg (left) and Johan Zettergren, Managing Director of Inter Terminals Sweden (right). New Gothenburg lease an opportunity to expand green portfolio: Inter Terminals  

Bunker terminal operator eyes tank conversion and construction projects for renewable products.

Map of US Gulf. Peninsula extends US Gulf operation offshore  

Supplier to focus on Galveston Offshore Lightering Area (GOLA) in strategy to serve growing client base.

The M/T Jutlandia Swan, operated by Uni-Tankers. Uni-Tankers vessel gets wind-assisted propulsion  

Fourth tanker sails with VentoFoil units as manufacturer says suction wing technology is gaining traction.

Port of Gothenburg Energy Port. Swedish biomethane bunkered in Gothenburg  

Test delivery performed by St1 and St1 Biokraft, who aim to become large-scale suppliers.

Image from Cockett Marine Oil presentation. Cockett to be closed down after 45 years  

End of an era as shareholders make decision based on 'non-core nature' of Cockett's business.

Petrobras logo. Petrobras confirms prompt availability of VLS B24 at Rio Grande  

Lead time for barge deliveries currently five days.

Opening of the IMO Marine Environment Protection Committee (MEPC), 83rd Session, April 7, 2025. IMO approves pricing mechanism based on GHG intensity thresholds  

Charges to be levied on ships that do not meet yearly GHG fuel intensity reduction targets.

Preemraff Göteborg, Preem's wholly owned refinery in Gothenburg, Sweden. VARO Energy expands renewable portfolio with Preem acquisition  

All-cash transaction expected to complete in the latter half of 2025.

Pictured: Biofuel is supplied to NYK Line's Noshiro Maru. The vessel tested biofuel for Tohoku Electric Power in a landmark first for Japan. NYK trials biofuel in milestone coal carrier test  

Vessel is used to test biofuel for domestic utility company.

Pictured (from left): H-Line Shipping CEO Seo Myungdeuk and HJSC CEO Yoo Sang-cheol at the contract signing ceremony for the construction of an 18,000-cbm LNG bunkering vessel. H-Line Shipping orders LNG bunkering vessel  

Vessel with 18,000-cbm capacity to run on both LNG and MDO.


↑  Back to Top