Tue 24 Nov 2009, 10:13 GMT

Bunker-producing refinery ready by 2013


Petrobras says new low-sulphur facility will be operational by 2013.



Petroleo Brasileiro (Petrobras) S.A. has announced that the company's new bunker-producing refinery in the state of Ceará, northeastern Brazil, will be operational by 2013.

Commenting on the project to build the country's new $11.1 billion low-sulphur facility, Petrobras President José Sergio Gabrielli de Azevedo said "There is no delay," affirming that the work schedule for construction of the Premium II Refinery in Caucaia, 54 km from Fortaleza, is going according to plan.

The refinery will mainly produce diesel with low sulphur content, but also marine diesel for the bunker market, kerosene for the jet fuel industry and naphtha as raw material for the petrochemical industry.

The plant's initial processing capacity will be 150,000 barrels of oil per day, reaching a full capacity of 300,000 barrels per day by 2016.

Brazil's refining capacity of 1.9 million barrels a day is about half the amount of oil Petrobras expects to produce by 2015. Petrobras's refining chief, Paulo Roberto Costa, has previously said that the company will need at least five new refineries over the next decade to handle its growing oil output.

The Ceará refinery project forms part of a plan to transform the port of Pecem near Fortaleza, into a steelmaking, chemicals and industrial center for the country's poorest and fastest-growing region. It will also help Petrobras refine its growing oil output into fuels for export to the U.S. and Europe.


RINA employee on board vessel. RINA unveils Mermaid propulsion concept to navigate uncertain decarbonisation landscape  

Fuel-agnostic design claims savings of more than 1,000 tonnes per year in some applications.

Adinkerke and Aalter naming ceremony. Exmar names third and fourth dual-fuel ammonia-powered vessels  

Midsize gas carriers Adinkerke and Aalter named at formal ceremony.

Professor Lynn Loo, GCMD. GCMD outlines practical approach to quantity assurance in marine biofuel supply chains  

New report addresses verification of both total fuel volume and renewable content in biofuel transactions.

Steel-cutting ceremony of London Express class vessel. Hapag-Lloyd cuts steel for first vessel of new London Express class  

16,800-TEU LNG dual-fuel vessel is first of 12 newbuildings in the class.

Vessels at sea. DNV report warns regulatory uncertainty complicates fleet investment decisions  

CEO urges greater clarity to provide the confidence needed for long-term investment.

Blue Whale NxtGen Energy battery system. Corvus Energy launches LFP battery system developed with BYD Energy Storage  

Blue Whale NxtGen Power targets tugs, ferries and workboats with high power demand.

Welcome ceremony of Yampu vessel. World’s first battery-powered self-unloading bulk carrier enters service in Australia  

MV Yampu connects South Australia’s limestone trade with a battery-electric propulsion system.

Skipanes vessel. E-methanol-ready ro-ro vessel delivered to Smyril Line  

190-metre vessel is built for year-round North Atlantic operations and designed for future e-methanol conversion.

Belgium flag. Sunoil Biodiesel secures approval to supply biofuels in Belgium  

Dutch biofuel supplier expands its European footprint with Belgian market entry.

Tacoma Maersk naming ceremony. Maersk takes delivery of dual-fuel methanol-capable Tacoma Maersk in China  

9,000-TEU vessel is one of six mid-sized dual-fuel ships joining Maersk's fleet.