Thu 28 Feb 2013 09:30

Aegean posts Q4 and full year results


Year-on-year Q4 net income falls, but bunker supplier achieves eighth consecutive quarter of profitability.



Bunker supply firm Aegean Marine Petroleum Network Inc. has recorded a full year net income of $20.1 million, or $0.44 basic and diluted earnings per share, in 2012. The figure represents an increase of $9.872 million, or 96.5 percent, on the $10.228 million net income achieved during the previous year after having posted a full year net profit of $18.733 million in 2010.

Gross profit for the full year was $302.6 million. Operating income was $55.0 million and operating income adjusted for the sale of non-core assets was $61.0 million.

Sales volumes last year were 10,620,864 metric tonnes compared with 10,646,271 tonnes in 2011 and 10,308,210 tonnes in 2010.

Recorded earnings before interest, taxes, depreciation, and amortization (EBITDA) in 2012 was $87.6 million, whilst EBITDA adjusted for the sale of vessels was $93.6 million.

For the three months ended December 31, 2012, the company achieved a net income of $3.3 million, or $0.07 basic and diluted earnings per share, compared with $6.3 million, or $0.14 basic and diluted earnings per share, during the corresponding period in 2011. Net income attributable to AMPNI shareholders, excluding a non-cash loss from the sale of a non-core vessel, was $5.1 million, or $0.11 basic and diluted earnings per share.

Total fourth quarter revenues of $1,734.7 million were consistent with the $1,740.3 million reported for the same period in 2011. Sales of marine petroleum products of $1,724.0 million were also in line with sales of $1,729.0 million for the same period in 2011. Gross profit, which equals total revenue less directly attributable cost of revenue, decreased by 4.77% to $71.8 million in the fourth quarter compared with $75.4 million in the same period in 2011.

The volume of marine fuel sold during the last three months of 2012 increased by 6.24% to 2,729,070 metric tonnes compared with 2,568,714 metric tonnes in 2011.

Operating income for the fourth quarter of 2012 decreased by 35.8% to $11.3 million compared to $17.6 million in 2011. Operating income excluding a non-cash loss from the sale of a non-core vessel was $13.0 million. Operating expenses excluding net book gains or losses on the sale of vessels increased by $1.0 million, or 1.8%, to $58.8 million compared with $57.8 million during the last three months of 2011.

Recorded EBITDA during the fourth quarter was $19.5 million, whilst EBITDA adjusted for the sale of vessels was $21.3 million.

Commenting on the results, E. Nikolas Tavlarios, President, said: "Our eighth consecutive quarter of profitability rounded out a year of strong performance for Aegean. During the fourth quarter we further strengthened our integrated marine fuel logistics chain and continued to build volume in our lubricants business."

Tavlarios continued: "Throughout 2012, we grew our business across all key areas as we executed on our growth initiatives, made notable progress in diversifying and expanding our revenue base and increased our global market share. At the same time, we reduced our operating expense structure and leveraged our fixed infrastructure - both of which positively impacted our bottom line."

Spyros Gianniotis, Chief Financial Officer, stated: "2012 was another strong year for the Company as we grew our base business and developed new revenue streams while improving the Company's cost structure. We executed on our strategy to sell non-core assets, which allowed us to reduce our expenditures related to maintenance and, at the same time, increase our fleet utilization and enhance overall profitability. As we leverage our dynamic financial model, we will use the financial flexibility it creates to invest in growth opportunities that we believe will create significant long-term value. We are well positioned to succeed should industry headwinds continue longer than anticipated, and at the same time, we have positioned the company to capitalize on improving macro fundamentals as they emerge."

Tavlarios concluded: "Looking ahead to 2013, despite the challenging macroeconomic environment, we believe our focus on profitable volume growth, diversification and operational efficiencies will allow Aegean to achieve continued growth and enhance shareholder value."


Marius Kairys, CEO of Elenger Sp. z o.o. Elenger enters Polish LNG bunkering market with ferry refuelling operation  

Baltic energy firm completes maiden truck-to-ship LNG delivery in Gdansk.

Samsung Heavy Industries (SHI) virtual reality (VR) training program developed in collaboration with Evergreen. SHI develops VR training solutions for Evergreen's methanol-fuelled ships  

Shipbuilder creates virtual reality program for 16,500 TEU boxship operations.

Illustratic image of Itochu's newbuild ammonia bunkering vessel, scheduled for delivery in September 2027. Itochu orders 5,000 cbm ammonia bunker vessel  

Japanese firm targets Singapore demonstration after October 2027, with Zeta Bunkering lined up to perform deliveries.

Bunkering of the Glovis Selene car carrier. Shell completes first LNG bunkering operation with Hyundai Glovis in Singapore  

Energy major supplies fuel to South Korean logistics firm's dual-fuel vessel.

Orient Overseas Container Line (OOCL) vessel. CPN delivers first B30 marine gasoil to OOCL in Hong Kong  

Chimbusco Pan Nation claims to be first in region to supply all grades of ISCC-EU certified marine biofuel.

The Buffalo 404 barge, owned by Buffalo Marine Service Inc., performing a bunker delivery. TFG Marine installs first ISO-certified mass flow meter on US Gulf bunker barge  

Installation marks expansion of company's digitalisation programme across global fleet.

Sogestran's fuel supply vessel, the Anatife, at the port of Belle-Île-en-Mer. Sogestran's HVO-powered tanker achieves 78% CO2 reduction on French island fuel runs  

Small tanker Anatife saves fuel while supplying Belle-Île and Île d'Yeu.

Crowley 1,400 TEU LNG-powered containership, Tiscapa. Crowley deploys LNG-powered boxship Tiscapa for Caribbean and Central American routes  

Vessel is the third in company's Avance Class fleet to enter service.

The inland LNG bunker vessel LNG London. LNG London completes 1,000 bunkering operations in Rotterdam and Antwerp  

Delivery vessel reaches milestone after five years of operations across ARA hub.

The M.V. COSCO Shipping Yangpu, China's first methanol dual-fuel containership. COSCO vessel completes maiden green methanol bunkering at Yangpu  

China's first methanol dual-fuel containership refuels with green methanol derived from urban waste.


↑  Back to Top