Wed 27 May 2026, 06:56 GMT | Updated: Wed 27 May 2026, 06:59 GMT

Construction begins on liquefied biogas facility at Port of Gothenburg


Nordion Energi's new plant aims to open up Swedish biogas supply to shipping and other sectors beyond the gas grid.


Liquefied biogas facility at Port of Gothenburg render.
Nordion Energi's new liquefied biogas facility at the Port of Gothenburg is set to connect Swedish gas grid producers with the shipping sector when it becomes operational in 2027. Image credit: Nordion Energi

Construction has begun on a liquefied biogas facility at the Port of Gothenburg, owned and developed by Swedish energy company Nordion Energi. The plant, which is expected to be completed in early 2027 and become operational before the end of that year, will have a capacity of around 50 tonnes of liquefied biogas per day.

According to Nordion Energi, the facility is designed to enable biogas producers connected to the gas grid to access new markets by liquefying the gas so that it can be transported and used in sectors such as shipping, heavy transport and industry — including in areas not served by the existing gas grid.

Carolina Wistén, Head of Customer and Market Gas Grid at Nordion Energi, explained: "Our goal is to help drive the transition of the gas grid to 100 percent renewable gas, and the liquefied biogas facility at the Port of Gothenburg will play a key role in that shift. It will also support the transition of shipping, heavy transport and industries located further away from the gas grid."

The Port of Gothenburg says that producers and end users are already in place and ready to make use of the liquefaction facility once it is operational. Several shipping companies that call at the port regularly are already using biogas to power their vessels and, according to the port, will be able to scale up that use once the facility is completed.

On the production side, energy company St1 Biokraft has already signed an agreement to secure part of the facility's capacity. Ted Gustavsson, Head of Value Chain at St1 Biokraft, noted: "Once the liquefaction facility is completed, we will have a strong solution in place at the Port of Gothenburg. This is a strategic step towards our goal of scaling up and offering competitive liquefied biogas to the shipping sector, while also taking a leading position in this segment."

Therese Jällbrink, Head of Renewable Energy at the Port of Gothenburg, remarked: "For shipping's transition to gain real momentum, the entire value chain needs to be in place and working together, something the maritime cluster at the Port of Gothenburg is well known for. This facility strengthens the port's position in renewable bunker fuels and will make it possible to offer liquefied biogas to shipping on a larger scale."



Samskip SeaShuttle vessel render. Samskip brings SeaShuttle project into European HyShip initiative to develop liquid hydrogen infrastructure  

Two hydrogen-powered container vessels will operate between Rotterdam and Oslo from 2027.

Antwerpen vessel. Korea Register and HD Hyundai team up to advance ammonia-fuel shipping in South Korea  

Two organisations are cooperating on eco-friendliness verification for ammonia dual-fuel vessels.

Fabio Cococcetta, WinGD. Green ammonia could become the first commercially viable zero-emission marine fuel, WinGD study suggests  

Joint report by WinGD and Envision Energy sets out the economic case for green ammonia.

Rasul Shirinov, Oilmar. Oilmar appoints junior marine fuels trader at Dubai trading desk  

UAE-headquartered bunker firm hires Rasul Shirinov, with a background in the agricultural sector.

Antonia Maersk vessel. Maersk bunkers large dual-fuel vessel with 100% ethanol in Barcelona  

Ocean carrier scales up ethanol bunkering in bid to broaden its low-emission fuel strategy.

Olyx logo. Amsterdam-based Olyx seeks renewable marine fuels broker  

Dutch energy brokerage interested in candidates with two to six years of experience in similar roles.

Mount Asahi vessel. CSSC delivers LNG dual-fuel bulker to Eastern Pacific nearly four months early  

210,000-tonne Mount Asahi handed over ahead of contract schedule.

Mount Vision vessel. New Times Shipbuilding delivers three LNG dual-fuel tankers in four days  

Chinese yard hands over one VLCC and two Aframax-size crude tankers within a single week.

Mercedes Pinto vessel TTS LNG bunkering. Baleària ferry completes LNG bunkering at regular berth in Las Palmas for first time  

LNG refuelling of Mercedes Pinto set to take place weekly without changing berth.

Baltic Timber vessel. Baltic Shipping Company takes delivery of wind-assisted hybrid coaster  

3,550-dwt vessel is fitted with Econowind VentoFoils and a battery package.