This is a legacy page. Please click here to view the latest version.
Mon 25 Jan 2010, 06:45 GMT

Petrobras appoints new Singapore manager


New appointment replaces previous bunker manager Marco Antonio Costa Tritto.



Leading Brazilian bunker supplier Petroleo Brasileiro (Petrobras) S.A. has announced that as from Monday January 25th, Mr André Máximo will be in charge of bunker business at the company's Singapore office.

Máximo replaces Mr Marco Antonio Costa Tritto, who returns to the company's headquarters in Brazil.

"Petrobras Bunker congratulates both colleagues for this new challenge and whishes all the best for their careers," Petrobras said in a statement.

Mr. Máximo’s contact details are as follows:

Office Number: + 65 6550 9085

Mobile Number: + 65 9757 8881

E-mail: andre.maximo@petrobras.com.br

Yahoo Id: andremaximo_petrobras


Christiania Energy headquarters. Christiania Energy relocates headquarters within Odense Harbour  

Bunker firm moves to larger waterfront office to accommodate growing team and collaboration needs.

AiP award ceremony for 20K LNGBV design. HD Hyundai Heavy Industries receives design approval for 20,000-cbm LNG bunkering vessel  

Bureau Veritas grants approval in principle following joint development project with South Korean shipbuilder.

Lloyd’s Register technical committee meeting in Spain. Peninsula outlines dual role in FuelEU Maritime compliance at Lloyd’s Register panel  

Marine fuel supplier discusses challenges for shipowners and opportunities for suppliers under new regulation.

Current status of fleet fuel types chart. LNG-fuelled container ships dominate January alternative-fuel vessel orders  

Container ships accounted for 16 of 20 alternative-fuelled vessels ordered in January, DNV reports.

Rick Boom, CIMAC and Professor Lynn Loo, GCMD. GCMD and CIMAC sign partnership to advance alternative marine fuel readiness  

Two-year agreement aims to bridge operational experience with technical standards for decarbonisation solutions.

Renewable and low-carbon methanol project pipeline chart as of January 2026. Renewable methanol project pipeline reaches 58.2m tonnes by 2031, GENA reports  

Project Navigator Methanol tracks 275 projects, including e-methanol, biomethanol and low-carbon methanol facilities globally.

Petrobras logo. Petrobras adjusts bunker pricing and minimum order volumes at Santos  

Brazilian supplier discontinues volume discount tier and lowers minimum order quantity from 1 March.

Viking Grace vessel. Viking Line secures biogas supply for 2026 after tenfold increase in biofuel use  

Åland-based ferry operator aims to maintain 50% biogas blend throughout the year on two vessels.

GNV Aurora vessel. GNV takes delivery of second LNG-powered vessel Aurora from Chinese shipyard  

Vessel to enter service on Genoa–Palermo route in April, completing first fleet renewal phase.

Tangier Maersk vessel. Maersk takes delivery of first methanol-capable vessel in 9,000-teu series  

Tangier Maersk is the first of six mid-size container ships with methanol-capable dual-fuel engines.


↑  Back to Top


 Recommended