This is a legacy page. Please click here to view the latest version.
Thu 25 May 2017, 13:15 GMT

Titan LNG doubles speed of bunker deliveries in Amsterdam


Supplier uses 'T-piece' to combine the flow of fuel from two trucks into one bunkering hose.



Titan LNG, one of the leading suppliers of LNG to maritime fleets in North West Europe, reports that it has managed to double the speed of its LNG bunkering deliveries in Amsterdam using a piece of equipment called the T-piece, which combines the flow of fuel from two trucks into one bunkering hose.

With a combined pumping rate of 28 tonnes per hour, the T-piece significantly reduces the bunker delivery time compared to sequential truck deliveries.

In a recent delivery, the chemical and oil tanker Fure West called at Amsterdam on May 19 and a total of six trucks supplied the vessel with LNG during an operation using a T-piece, Titan LNG reports.

Commenting on the delivery, Lars Hoglund, managing director at Furetank, remarked: "We really appreciate the efforts made by Titan LNG to deliver LNG to our ships. Quick and efficient bunkering operation is of the utmost importance to us. We look forward to continued cooperation with them in the future."

Didier de Beaumont, Commercial Manager at the Dutch port, noted: "The procedure [on May 19] was permitted at the 'Groene Kade' LNG quay by the Port of Amsterdam Harbourmaster based on a quantitative risk assessment. We are very pleased to be the first port in the wider region that is able to approve the simultaneous discharging of two trucks. We welcome this advance in efficiency, which will hopefully further accelerate the transition to LNG as a marine fuel with the associated environmental benefits."

"We are very happy with this result and the increase in the speed of bunkering process," said Titan LNG's Michael Schaap. "Speed is important to reduce the downtime of the vessel so that LNG can compete in every way with conventional bunker fuels. The T-piece is an important innovative step on the road to launching our Flex-Fueler bunkering pontoon next year."

As Bunker Index reported in September, the Titan LNG Flex-Fueler was designed and developed by Titan LNG as a new solution for the delivery of LNG to both sea-going and river barges in the Amsterdam-Rotterdam-Antwerp (ARA) region - Europe's largest bunkering hub. It is set to be the first LNG bunkering pontoon in North West Europe when launched in the first quarter of 2018.

The solution is designed to have a fixed location to supply inland waterway vessels, but also be navigated to larger sea-going vessels and supply LNG while they load or unload cargo. As a result, the Flex-Fueler is said to minimize costs and maximize operational efficiencies, while providing a safe and quick delivery of LNG.


IBIA board elections 2026 IBIA opens voting for board elections with 11 candidates competing for four positions  

Members have until 5 February to vote, with results to be announced at AGM.

ABB and RSP contract signing. Rotterdam Shore Power selects ABB for world's largest shore power project  

ABB to engineer shore power systems with over 100MVA capacity at Europe's largest port.

Michael Cammarata, managing director of Glander International Bunkering's Florida office. Michael Cammarata appointed managing director of Glander International Bunkering's Florida office  

Cammarata succeeds Larry Messina, who will step down after 34 years in the role.

Steel cutting ceremony of a 155,500-dwt LNG dual-fuel crude oil tanker with builder's hull no. 0315848. Steel cutting begins on LNG dual-fuel Aframax tanker  

Chinese yard cuts steel for 155,500-dwt crude carrier.

BV and CMDT cybersecurity agreement signing ceremony. Bureau Veritas and CMHI sign agreements to advance green and smart shipping solutions  

Classification society and Chinese shipbuilder strengthen partnership with cybersecurity and alternative fuel certifications.

Steel cutting ceremony of a 8400-teu LNG dual-fuel container vessel with builder's hull no. 0208111. Steel cutting begins on 8,400-teu LNG dual-fuel container vessel  

Chinese yard commences construction on LNG-powered container ship with Lloyd's Register oversight.

Keel-laying ceremony of a 155,500-dwt LNG dual-fuel crude oil tanker with builder's hull no. 0315871. Keel laid for LNG dual-fuel crude oil tanker in China  

Ceremony held on 23 December for LNG-capable tanker under Lloyd’s Register class.

Keel-laying ceremony of a 155,500-dwt LNG dual-fuel crude oil tanker with builder’s hull no. 0315844. Keel laid for 155,500-dwt LNG dual-fuel crude oil tanker  

Chinese shipyard begins construction on Suezmax tanker, with Maran and ABS staff in attendance.

Steel cutting ceremony for CMA CGM’s 8,400-teu LNG dual-fuel container vessel. New Times Shipbuilding begins steel cutting on 8,400-teu LNG dual-fuel boxship  

Chinese shipyard begins construction on vessel for CMA CGM with Lloyd's Register classification oversight.

ISCC Logo. Golden Island secures ISCC EU certification for sustainable marine fuel trading  

Singapore-based firm can now supply B100 biodiesel and green methanol with verified sustainability proofs.


↑  Back to Top


 Recommended