This is a legacy page. Please click here to view the latest version.
Mon 10 Jun 2013, 07:45 GMT

LNG bunker barge concept unveiled


LNG tank has a 4000-cubic-metre storage capacity.



Norwegian offshore oil and gas engineering specialist NLI Solutions (NLI) has developed a concept for an LNG bunker barge based on the NLI LNG tank design. The concept has been further developed in a design study together with the marine division of Rolls-Royce and Wilhelmsen Technical Solutions (WTS).

In a statement, NLI said: "LNG is among the cleanest and most cost-efficient options for low emission shipping. Interest in LNG as a marine fuel is rapidly increasing, but one limiting factor is practical availability of LNG bunker facilities. LNG bunker barges are often described as the 'missing link' in the LNG supply chain. Today, only one example exists, capable of carrying 187 cubic metres (cbm) of LNG, even though ocean-going ships need to bunker several thousand cbm."

The LNG barge is designed to meet the multiple demands of a cost-effective, high-tech, high-volume barge.

For safe operations and increased manoeuvrability, the barge will be equipped with podded propulsion, similar to those used in offshore support vessels, as well as state-of-the-art electronics for early threat detection.

The NLI LNG tank is an atmospheric, prismatic steel tank, type 'B', with a capacity of 4000 cbm of LNG. It will be fitted with a new insulation system with very low levels of boil-off gas.

Onboard power and propulsion are fed by an environmentally-friendly gas engine. The barge has a large pressure tank on the aft deck for boil-off gas handling and gas delivery to the engine.

Since re-condensation equipment is very expensive, takes a lot of space, and has very low efficiency for small installations like this, excess boil-off gas can be delivered to a shoreside gas grid when the barge is not carrying out bunkering operations. The vessel can also deliver electric power to a shoreside electric grid.

The various planning tasks have been divided up as follows:

NVC – responsible for design, Bergen gas engine, pod drives and bridge systems;

TI Marine Contracting (part of WTS) – responsible for insulation systems;

NLI – responsible for tank, LNG/gas systems, bunkering systems;

Det Norske Veritas (DNV) – evaluation of the barge concept with respect to limitations and possibilities within the existing codes and regulations.


TMS Tankers logo. Lloyd’s Register delivers fleet-wide energy transition roadmap for TMS Tankers  

LR Advisory maps vessel-level compliance risk and decarbonisation pathways across the Greek owner’s tanker fleet.

Dr Prapisala Thepsithar, GCMD. GCMD shares biofuel assurance and green finance insights at Hong Kong shipping decarbonisation forum  

The Global Centre for Maritime Decarbonisation presented pilot findings on biofuels and energy efficiency financing.

Laura Maersk ethanol bunkering graphic. Maersk conducts large-scale ethanol bunkering trial on Laura Maersk in Rotterdam  

A.P. Moller – Maersk has conducted a barge-delivered ethanol bunkering operation as part of ongoing fuel trials.

Luminara vessel truck-to-ship bunkering. MOL Techno-Trade completes first LNG bunkering for international cruise ship in Hokkaido  

Truck-to-ship LNG operation at Hakodate marks first such supply to an international cruise vessel in Hokkaido.

Acta Gemini vessel. Acta Marine takes delivery of methanol dual-fuel CSOV Acta Gemini for RWE wind farm charter  

The vessel will support operations at the Sofia Offshore Wind Farm at Dogger Bank.

Yeva Wood and Kirsten Møller Jørgensen. Malik Supply expands Danish team with bunker trader and finance hire  

Danish bunker supplier Malik Supply adds two new staff across its Fredericia and Aalborg offices.

AiP award ceremony for a 10,000-teu biofuel-powered container ship. HJSC wins AiP for 10,000-teu biofuel-powered container ship design  

South Korean shipbuilder HJ Shipbuilding & Construction receives classification society approval for its biofuel vessel design at Posidonia.

Active vessel. Capital Clean Energy Carriers takes delivery of LNG carrier and dual-fuel gas carrier, secures five new charters  

Athens-based CCEC expands its fleet and pushes contracted revenue backlog to $3.1bn.

VPS logo. Fuel quality management for vessels in extended idle: Arabian Gulf, Gulf of Oman and adjacent anchorages | Rahul Choudhuri, VPS  

Managing fuel quality deterioration following the closure of the Strait of Hormuz.

Person signing a document. Agastya Green Fuels signs 250,000 t/yr e-methanol offtake deal with Sri Lanka’s SAR Group  

Indian producer and Sri Lankan maritime firm agree long-term green methanol supply partnership.


↑  Back to Top